ELM Home


 
News  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
   
  
 
   
 
 
 
 
  Who to Contact 
SiteMap 
Search 
Help 
ELM Home 
Everglades Projects 
Watershed Mgmt. 
SFWMD Home
 
Use of information herein constitutes acceptance of our disclaimer.
Home Help News Contact Site Map ELM Search


ELM News

These pages are used to list the significant updates in model 1) documentation, 2) application, and 3) development.

Documentation Updates

back to top
  • Dec 21 2002: ELMv2.1a calibration performance report (9.7 Mb Adobe Acrobat pdf).

  • Oct 15 2002: Complete (as can be in limited time) version of ELM response to MRT reviewers' comments. (900 kb Adobe Acrobat pdf).

  • Oct 3 2002: Draft ELM response to MRT reviewers' comments. (900 kb Adobe Acrobat pdf); the Oct 2 presentation is here (300 kb pdf).

  • Aug 7 2002: Presentation on ELM status to CERP Model Refinement Team (MRT) (2 MB Adobe Acrobat pdf).

  • July/Aug 2002: Model documentation has major additions for informational and detailed review purposes. Source code and data may also be downloaded from this area.

  • May 2002: Detailed ELM presentation from May 9 USGS Informational Workshop (3.6 MB ftp download, zipped PowerPoint file).

  • May 2002: Everglades Division Research presentation from May 9 USGS Informational Workshop (4.8 MB ftp download, zipped PowerPoint file).

  • May 2002: Site selected for SciLinks by National Science Teachers Association.

  • April 2002: Detailed ELM presentation from April 24 Basin Feasibility Study meeting (1.7 MB ).

  • March 2002: Added ELM overview slide show to main page.

  • February 2002: Restructured and moved ELM web site (with "redirect" at the old URL).

  • January 2002: New manuscript on ELM v.2.1 application completed internal review.

    Application Updates

    back to top
  • The version of the ELM currently used for application is v. 2.1 (deployed on March 11, 2000).

  • March 2002: Initiate simulations of surface water quality for ECP Basin Feasibility Study of downstream impacts of STAs.

  • 2001-2002: Interagency concensus-building required prior to modeling and analysis of CSOP.

  • March 2001: Available to simulate surface water quality for evaluations of ModWaters/C111 (CSOP).

    Model Development

    back to top
  • Jan 2002: Acquiring data for updating period-of-record of the calibration/verification simulation (ELM v.2.2) for hydrology and surface water quality; target completion is September 2002.

  • Jan 2002: Acquiring data for updating calibration (ELM v.2.x) of full suite ecological performance measures (beyond only hydrology and surface water quality); preliminary target completion is December 2002.  
     

    back to top