DETAIL DESIGN WORK SHEET: <%=(title.Fields.Item("Project").Value)%>

Contributor:
<%=(rmcon.Fields.Item("cont").Value)%>
Date:
<%= DoDateTime((rmcon.Fields.Item("d").Value), 1, 2057) %>
REQUIREMENTS
CONTRIBUTING
FACTORS
CURRENT
STATUS
REQUIRED
ACTION
 
Good      Marginal     Poor
Revise
Proceed   |   N/A     

FUNCTIONAL

Overall geometry
Motion of parts
Forces involved
Energy needed
Materials to be used
Control system
Information flow
SAFETY
Operational
Human
Environmental
QUALITY
Quality assurance
Quality control
Reliability
MANUFACTURING
Production of components
Purchase of components
Assembly
Transport
TIMING
Design schedule
Development schedule
Production schedule
Delivery schedule
ECONOMIC
Marketing analysis
Design costs
Development costs
Manufacturing costs
Distribution costs
ERGONOMIC
User needs
Ergonomic design
Cybernetic design
ECOLOGICAL
Material selection
Working fluid selection
AESTHETIC
Customer appeal
Fashion
Future expectations
LIFE-CYCLE
Distribution
Operational
Maintenance
Disposal

© Hales & Gooch 2004

<% rmcon.Close() %> <% rmcon1.Close() %> <% title.Close() %>